System realized with 1 engine of 1.000 kWe.
The energy from coolant is used to produce hot water and the exhaust for steam, both utilized in the specific production process.
Power plant in kWe
Primary energy saving
Economic saving
Payback period (in years)
System realized with 1 engine of 500 kWe.
The energy from coolant and exhaust is used to heat the water utilized by the production process.
Power plant in kWe
Primary energy saving
Economic saving
Payback period (in years)
System realized with 1 engine of 200 kWe.
All the usable heat of the engine is utilized to warm the water needed by the industrial process.
Power plant in kWe
Primary energy saving
Economic saving
Payback period (in years)
System realized with 1 engine of 1.200 kWe.
All the engine heat (coolant and exhaust) is saved for the factory warming in winter and for the molds cooling, through a Lithium Bromide absorption chiller, in the other seasons.
Power plant in kWe
Primary energy saving
Economic saving
Payback period (in years)